QUALITY CONTROL PROCEDURE FOR INSPECTION
The Quality Control Procedure is made in accordance with the procedures, specifications, work instructions and the client requirements. The Quality Control Procedure will detail the administrative and operational activities of each equipment which will contain the methods of inspection, level of Quality Assurance required, Acceptance criteria, witness and hold points and documentation reference.
The Quality Control Procedure is divided into 3 major categories.
1. Inspection and Testing Procedure for Bought Out Items.
2. Inspection and Testing Procedure for Manufactured Items.
3. Inspection and Testing Procedure for Standard Items.
Inspection and Testing shall be done for all the products / Equipments in accordance with Quality Assurance Plan. These inspection and Testing shall be in 3 stages as follows :
I. Raw Material Inspection and Receipt inspection.
II. In-process Inspection (Stage Inspection).
III. Final Inspection.
I. Raw Material Inspection :
This is normally carried out on receipt of material at works for conformance of specified requirements as per the drawing and technical specifications. The materials shall be released for the production purpose on verification of accompanying documents. This is to permit immediate recall and replacement in the event of non-conformance of specific requirement. Also samples shall be taken from each lot at random, given for Chemical Analysis and Physical Properties of the same, which shall be normally done for special type of Alloy Steel.
II. IN-PROCESS INSPECTION :
1. In process Inspection shall be carried out as per the Inspection and Testing plan.
2. Product acceptance will be determined by the acceptance criteria laid down in the specification and the Test plan.
3. Manufactured products shall not be released for further processing until all the required inspection and tests are to be completed or the necessary reports are verified.
III. FINAL INSPECTION :
All the manufactured / bought out items shall undergo for final inspection in accordance with the specified contractual requirements prior to despatch, with the consent of client. All Final Inspection and Testing shall be carried out in accordance with the Inspection & Testing Plan.
Manufactured items shall be accepted when :
1. All inspection and Test activities have been accepted.
2. All relevant inspection and Test documents have been completed.
3. All non conformance have been dis-positioned and implemented.
No manufactured items shall be despatched until all the activities specified in the Inspection and Test Plan have been satisfactorily completed.
|